Indian NIWE Solar Resource Assessment Network
2016.07.08 From: GEONICA S.A.
India selects Geonica and its Indian partner SGS Weather for solar resource assessment network (Phase-1, Phase-2 and MEDA)
Geónica S.A. (Spain) and our Indian Distributor, SGS Weather, are chosen to supply measuring instruments and to install, commission and maintain a network of >124 (phase-1, 2 and MEDA) remote measurement stations for solar radiation resource assessment in India.
The network will be used by NIWE National Institute of Wind Energy Technology, (formely C-WET) an autonomous R&D institution under the India Ministry of New and Renewable Energy.
The purpose of the network is to generate the “solar map” of India. Solar maps, showing real data of yearly solar radiation levels, are used for design of solar power plants. Detailed historical data series are made available by NIWE as a commercial service.
The network continuously monitors and stores nationwide solar radiation and weather parameters and communicates these to a Data Receiving Center (DRC) with redundancy loca- ted at C-WET Headquarters in Chennai. Eachmeasurementstationisequippedwith high accuracy meteorological sensors. More specifically, every station includes a METEODATA Data Logger / Controller, a SunTracker 3000 and several solar radiation sensors, such as a Pyrheliometer mounted on the solar tracker, and two Pyranometers (one shaded for the measurement of the Diffuse Radiation). Data is transferred via GPRS cellular network to the Data Receiving Center for analysis and final archiving. In Phase-2 there are also four “Advanced” Stations measuring Albedo Irradiance, Far Infrared Irradiance (Pyrgeometer) and AOD. Real-time data is also available in Internet by means of GEONICA WEBTRANS Ubiquitas Internet Platform.
Key to the selection of suppliers over competitors was a combination of factors:
Instruments with excellent technical specifications. These include a SunTracker 3000 working at very low power with integrated on-board datalogging / transmission capabilities and real time data quality assurance by Geonica and solar sensors with excellent temperature dependence and zero offset.
The proven record of SGS Weather in installation as well as after sales service and maintenance.
A competitive price level.
Installation and commissioning of the Phase-2 and MEDA was carried out on Sep. 2013-Feb.2014. Phase-1 was completed on Nov. 2011
Model SunTracker-3000 with shadow arm and disc, two Pyrheliometers and two Pyranometers
Each one of the Stations of Phase-1 Phase-2 (red points in the map) is measuring:
Global Horizontal Irradiance (GHI)
Direct Normal Irradiance (DNI)
Diffuse Horizontal Irradiance (DHI)
Wind Speed and Direction
Ambient Temperature and Relative Humidity
Atmospheric Pressure
Each one of the 4 “Advanced” Radiation Stations (blue points in the map) is measuring:
Albedo Irradiance (Albedometer)
Far Infrared Radiation (Pyrgeometer)
AOD (Sunphotometer)
More from CSP Focus
NextCSP Focus Morocco 2018 ends, concentrated solar power in MENA never stops
Concentrated solar power tower exposes materials to intense heat to test thermal response
Can NREL’s Fault-Finding Study Help Concentrated Solar Power?
World's First Utility-Scale Molten Salt Fresnel CSP Plant Connects to China’s Grid
Rebirth of SolarReserve’s 450 MW Likana Brings CSP Supply Chain Hope for Chile
Morocco invests 2.3billion dollars to boost solar energy use in agriculture
Leave your thoughts here
Reports(Member Only)
See more+-
CSP Focus Membership Proposals
We are now proposing CSP Focus Membership, hoping to better serve our members to keep pace with the latest updates of ongoing CSP projects worldwide, and to establish and maintain business relations with major shareholders of the projects. CSP Focus offers to Membership exclusive access to:1. Daily/Weekly update and analysis on CSP policies, projects, technologies, market trend and corporate relea
-
The Latest CSP Focus Monthly Update
Join CSP Focus Membership to Get the Latest CSP Focus Monthly Update December Edition.
-
CSP Project Monthly Update 2022 December Edition
CSP Focus is presenting CSP Project (China) Update 2022 December Edition.Detail report is available for CSP Focus Membership.
-
Presentations-CSP Focus China 2021
The Report is for CSP Focus Members only.
Upcoming Events
See more+-
12th CSP Focus China 2022
2022.04.21-22 Beijing
-
11th CSP Focus China 2021
2021.10.28-29 Beijing
-
10th CSP Focus China 2020
2020.10.22-23 Beijing, China
Project Updates
See more+-
Lanzhou Dacheng Dunhuang CSP Project
Asia Pacific-China,Operational,Parabolic Trough
-
Luneng Haixi 50MW Molten Salt Tower CSP Project
Asia Pacific-China,Operational,Power Tower
-
Dubai 950MW NOOR Energy 1 CSP+PV Project
MENA-UAE,Under construction,Power Tower
-
Power China Gonghe 50MW Molten Salt Tower CSP Project
Asia Pacific-China,Operational,Power Tower