Home > Market > Other Regions > Here
SET Plan annual progress report 2019 published
2019.12.26 From: SETIS
The SET Plan has confirmed its role as the key EU energy research and innovation initiative that serves the Energy Union goals and delivers the innovations necessary to achieve the European transition to climate-neutrality by 2050. It has put forward a dedicated vision for each technology area by setting ambitious targets to be reached in the next decade(s) with the overall goal to place Europe at the forefront of the next generation of low-carbon energy technologies and of energy efficiency. For each of these technology areas, Implementation plans have been developed that facilitate the meeting of these targets. The 14 Implementation plans cover all the Energy Union Research & Innovation priority areas and the SET Plan 10 actions. They were endorsed by the SET Plan Steering Group[1] and the European Commission in 2018[2].
In order to execute the Research & Innovation activities presented in the Implementation plans, interested SET Plan countries, and relevant industrial and research stakeholders have formed Implementation working groups (IWG). These groups have the task to advance the respective Implementation plans, reaching collectively the agreed technology targets. AGENDA 23[3] calls for “each IWG to develop a working methodology based on indicators to monitor the progress of actions under the Implementation plans and feeding the relevant information to the Strategic Energy Technologies Information System (SETIS).”
SETIS has created a reporting methodology to facilitate this process, based on templates that have been presented in the 12th SET Plan conference in Bucharest and subsequently validated by the Steering Group members. Following a workshop dedicated to this process, the IWGs have been requested to complete these templates, provided by SETIS, which form the basis of the pilot “2019 SET Plan progress report”.
This publication, released during the 13th SET Plan conference in Helsinki, offers a concise overview of this pilot phase of the SET Plan monitoring process, presenting the state of the implementation of the SET Plan based on the inputs from the SET Plan IWGs.
Download the report: set plan report 2019.pdf
Find previous SET Plan annual progress reports:
https://setis.ec.europa.eu/publications/set-plan-implementation-progress-reports
[1] With the exception of the Nuclear safety Implementation plan that was endorsed by BE, CH, CZ, ES, FI, FR, HR, HU, IT, LT, NL, PL, RO, SI, SK, TR and UK.
[2] https://setis.ec.europa.eu/actions-towards-implementing-integrated-set-plan
[3] https://setis.ec.europa.eu/system/files/set-plan_agenda23.pdf
Upcoming CSP events:
10th CSP Focus China 2020 (March.25-26, Beijing China)
5th CSP Focus MENA 2020(June.23-24,Dubai, UAE)
More CSP news and reports please visit www.cspfocus.cn
or CSP Focus social media on LinkedIn, Twitter, Facebook.
More from CSP Focus
NextChina 4 CSP demos quit and 16 totaling 1014MW to be completed successively by 2020
EPC Confirmed for Yumen 100MW CSP Project and More on CSP Update Last Week
World biggest solar tower with storage NOORo 3 starts commissioning
Chilean Market is Gold Reserve for Concentrated Solar Power Technology
Solar CSP core technology R&D to boost the expansion of Shanghai Electric
Deputy Prime Minister of South Korea Yoo Eun-hae Visits SAMSON
Leave your thoughts here
Reports(Member Only)
See more+-
CSP Focus Membership Proposals
We are now proposing CSP Focus Membership, hoping to better serve our members to keep pace with the latest updates of ongoing CSP projects worldwide, and to establish and maintain business relations with major shareholders of the projects. CSP Focus offers to Membership exclusive access to:1. Daily/Weekly update and analysis on CSP policies, projects, technologies, market trend and corporate relea
-
The Latest CSP Focus Monthly Update
Join CSP Focus Membership to Get the Latest CSP Focus Monthly Update December Edition.
-
CSP Project Monthly Update 2022 December Edition
CSP Focus is presenting CSP Project (China) Update 2022 December Edition.Detail report is available for CSP Focus Membership.
-
Presentations-CSP Focus China 2021
The Report is for CSP Focus Members only.
Upcoming Events
See more+-
12th CSP Focus China 2022
2022.04.21-22 Beijing
-
11th CSP Focus China 2021
2021.10.28-29 Beijing
-
10th CSP Focus China 2020
2020.10.22-23 Beijing, China
Project Updates
See more+-
Lanzhou Dacheng Dunhuang CSP Project
Asia Pacific-China,Operational,Parabolic Trough
-
Luneng Haixi 50MW Molten Salt Tower CSP Project
Asia Pacific-China,Operational,Power Tower
-
Dubai 950MW NOOR Energy 1 CSP+PV Project
MENA-UAE,Under construction,Power Tower
-
Power China Gonghe 50MW Molten Salt Tower CSP Project
Asia Pacific-China,Operational,Power Tower