中文  |  ENGLISH

Presentations-CSP Focus China 2020

<BACK

Report Name : Presentations-CSP Focus China 2020

Reporter/Writer : CSP Focus

Year : 2020

Venue : China

Conference : CSP Focus China 2020

Outline

The Report is for CSP Focus Members only


CSP to Accelerate Energy Transition

——Rui Sun, Former Vice President, Electric Power Planning and Engineering Institute


Performance of Supcon Delingha 50MW Tower CSP and O&M Lessons Learned

——Jianxiang Jin, Chairman, SUPCON Solar


To Complete Future CSP Projects with Current Sci&Tech Achievement

——Chengye BI, Vice General Manager, Shouhang High-Tech Energy


Planning and Operation of CSP in RE System

——Dr. Ning ZHANG, Associate Professor, Department of Electrical Engineering and Applied Electronic Technology, Tsinghua University


Low Cost Trough CSP Technology: Economic Analysis of Silicon Oil HTF with Bigger Collector

——Zenghua TIAN, Director, North China Power Engineering Co., Ltd


Advantages of CSP in a Multi-Energy Integration System

——Richard Yu, CEO, Royal Tech CSP


Active Tracking and Its Benefit for CSP Powerplan

——Alexander v. Sperber, CEO, Cambras & Lukas Kirscht, CTO, Cambras


Enhancing Risk Managing by Using Thermographic Monitoring Solution

——Steffen Sturm, Project Manager,InfraTec GmbH


Cerro Dominador & outlook for CSP in Chile

——Fernando Gonzalez, CEO, Cerro Dominador


Report on Luneng Haixi Multiple Energy Integration & Optimization Pilot Project

——Xuyao ZENG, Chief Engineer, Luneng New Energy


O&M Experience of CGN Delingha 50MW CSP Plant

——Xiaolong DU, Deputy Technology Director, CGN New Energy Delingha Co., Ltd


Lessons Learned on the Construction of Molten Salt CLFR 50MW CSP Plant in China & Lanzhou Dacheng Molten Salt CLFR System and Testing Report

——Yulei Fan, Director, Development and Planning, Lanzhou Dacheng


System Integration and Digitalization Practice in Power China Gonghe 50MW Tower CSP Project

——Junfeng ZHANG, Deputy Chief Engineer, New Energy Department, Northwest Engineering Co., Ltd.


Reliablity of Power Supply and Selection of Energy Storage in RE Hybrid System

——Wei Han, Senior Engineer, Northwest Electric Power Design Institute Co., Ltd.


Cable Laying and BOS Design in Solar Field of Tower CSP Plant

——Jiaqi LI, Engineer, Inner Mongolia Electric Power Survey&Design Institute Co., Ltd


Commissioning and O&M- Mobile Test Utility

——Zhiheng Lu, General Manager, Shuangliang Royal Tech CSP Technology


EPC Partnership between Spanish and Chinese companies: Advantages and experiences of a collaborative approach

——Mr. Alberto Alba Rodríguez, Head of BD – Asia Pacific, Head of Battery Energy Storage Systems, Abengoa


CSP From 2020 Onward - The Spanish Case

——Gonzalo Martin, Secretary General, Protermosolar


The Opportunities of Overseas CSP New Projects for Chinese Companies

——Xavier Lara, CEO, Aelius


STORAGE MIX TO ENHANCE RENEWABLE PENETRATION

——Mr. Abderrahim Jamrani, Engineering Director, MASEN


Latest News

See more+
  • CSP Project Tenders Last Week (Aug 8 - 14)

    Bidding for External Review of Feasibility Study Report of Jixi Base Lugu DC 1.4 GW RE Project (CSP 100MW) On August 8, SPIC issued a request for quotation (RFQ) for the external review service of feasibility study report of Jixi Base Lugu DC 1.4 GW RE project, including 100MW of CSP. Quotation deadline: 2022-08-12 14:41 Quotation validity: 2022-11-12 EPC Bidding - China Energy Investment 100MW CS

  • 158 GWh – Annual Generation of SUPCON Delingha 50MW Tower CSP Project Released

    The operational data of SUPCON Delingha 50MW Tower CSP Project arrived as expected. From August 6, 2021 (after the completion of the turbine rectification) to August 5, 2022, the cumulative actual power generation of the plant for the complete year was 158 GWh, reaching 108% of the annual design power generation (146 GWh) and setting the highest operational record of the same type of power plant i

  • CSP Projects Updates – First Week of August (8.1-8.7)

    Feasibility Study Bidding for SPIC Hami 1GW CSP+PV Project Xinjiang Energy & Chemical Co., Ltd. of State Power Investment Corporation (SPIC) invited public bids for the feasibility study of SPIC Hami 1GW CSP+PV Project, which includes 100MW of CSP and 900MW of PV. RFQ for Datang Shichengzi 1GW CSP+PV Demonstration Project Datang Hami Wind Power Development Co., Ltd. released a procurement anno

  • RayGen connects concentrated solar power towers to the grid, but storage component will have to wait

    A Melbourne-based solar storage technology company hoping to combine solar power and long duration energy storage (LDES) has announced that one component of its flagship site in Western Victoria isnow connected to the grid.RayGen – backed by AGL and a host of big international energy companies – said on Wednesday that it is sending power to the grid from its Carwarp site just over 30 kilometres

Upcoming Events

See more+

Project Updates

See more+

CONTACT US

Tex:

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news