中文  |  ENGLISH

Power Output Reduction Caused by Equipment Accidents —Supcon 10MW&50MW CSP Tower Plant Case Study

<BACK

Report Name : Power Output Reduction Caused by Equipment Accidents —Supcon 10MW&50MW CSP Tower Plant Case Study

Reporter/Writer : Jin Jianxiang, Chairman of SUPCON Solar

Year : March, 2018

Venue : Beijing, China

Conference : CSP Focus China 2018

Outline

● Analysis of impacts on LCOE for STE plants
Price and LCOE
Factors Impact on LCOE
Comparison of Impacts on LCOE
Real risks who impact on LCOE
● Analysis of impact factors on production of SUPCON Delingha 10MW plant
Capacity of sustained and stable production
Achievement rate of production without equipment accidents
Comparison of power generation calculations
Productions for 16 months
A case of equipment accident- plugging of receiver tubes
Impact of severe weathers
Summary of operation
● Plan and progress of SUPCON 50MW CSP demonstration project
Introduction to Delingha 50MW project
Progress of 50MW project

Latest News

See more+
  • World’s largest Concentrated Solar Power plant ties tariffs to big storage to hit record price

    ACWA Power’s Noor Energy 1 CSP-PV project in Dubai combines optimized 15-hour CSP storage with demand-focused tariffs and supply chain efficiency to hit the record-low price of $73/MWh, project partners told the CSP Madrid 2018 conference.Last month, Saudi Arabia’s ACWA Power and the Dubai Electricity and Water Authority (DEWA) agreed to add 250 MW of PV capacity to the 700 MW Noor Energy 1 CSP

  • The technological leap at Noor Ouarzazate III

    The Noor Ouarzazate III concentrated solar power (CSP) plant, part of the largest solar complex on Earth, is already in service in Ouarzazate, Morocco, and almost ready to enter commercial operation. Rated at 150 MW, it differs from two adjacent plants, Noor Ouarzazate I and Noor Ouarzazate II, already in operation, thanks to its novel technology: Noor Ouarzazate III uses a power tower with molten

  • Largest concentrated solar plant in Africa reducing Morocco's dependency on external power

    Morocco currently depends on external sources for 95 percent of its primary energy needs. Between 2002 and 2012 alone, the country’s energy consumption increased by an average of 7.2 percent. Meanwhile, Morocco’s demand for primary energy is expected to triple, while demand for electricity is set to quadruple by 2030. In response to this, the country has prioritized improving its home-grown powe

  • CPECC Hami Tower CSP Project progressed well with installation, to be completed in Mid 2019

    Enlisted in China CSP Pilot Projects, CPECC Hami 50MW molten salt tower CSP project has been progressed well and the project installation work had been fully started last month in November after the structure of the 180m receiver tower was completed in late October.

Upcoming Events

See more+

Project Updates

See more+

CONTACT US

Tex:+86-21-6111 0177

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news