中文  |  ENGLISH

Suppliers List of China Key CSP Projects (Updating)

<BACK

Report Name : Suppliers List of China Key CSP Projects (Updating)

Reporter/Writer : CSP Focus光略咨询

Year : July 16th, 2019

Venue : China

Conference : CSP Focus Innovation 2019 (Oct.24-25 Beijing)

Outline

Updating--July, 2019 Edition

28 pages in total

 

Bidding and vendor information of 13 China commercial CSP projects,

of which 4 have been operational since 2018, and 9 under construction.

 

  1. Shouhang Dunhuang 100MW Molten Salt Tower CSP Project (P1-2)

  2. Royal Tech Yumen 50MW Parabolic Trough CSP Project (P3)

  3. DCTC Dunhuang 50MW Molten Salt CLFR CSP Project (P4-5)

  4. Rayspower Yumen 50MW Parabolic Trough CSP Project (P6)

  5. CSNP Royal Tech Urat 100MW Parabolic Trough CSP Project (P7-10)

  6. Supcon Delingha 50MW Molten Salt Tower CSP Project (P11-12)

  7. Power China Gonghe 50MW Molten Salt Tower CSP Project (P13-16)

  8. CPECC Hami 50MW Molten Salt Tower CSP Project (P17-20)

  9. CGN Delingha 50MW Parabolic Trough CSP Project (P21-22)

  10. Yumen Xinneng 50MW Molten Salt Tower Beam-down CSP Project (P23-24)

  11. Jinfan Akesai 50MW Molten Salt Parabolic Trough CSP Project (P25)

  12. Luneng Haixi 50MW Molten Salt Tower CSP Project (P26-27)

  13. Huaqiang Zhaoyang Zhangjiakou 15MW CLFR CSP plant (P28)

 

Note:

 

The report is produced by CSP Focus based on the collection of information online and offline. Any suggestions are much welcome to csp@cspfocus.cn/21-61110177.

 

The report will be kept updating on CSP Focus website. Updated information after the last version will be highlighted, for which you may read again online by using the password you already got earlier.

Latest News

See more+
  • Lebanon calls for bid on consultancy services for a concentrated solar power plant

    The Lebanese Center for Energy Conservation(LCEC) has published a Request for Proposal (RFP) for Consultancy Services for the Development of a Concentrated Solar Power (CSP) Plant in Hermel Lebanon.The project will have a capacity of at least 50 MW with 7.5 hours of storage. The consultant will be in charge of the preparatory studies for the CSP plant, consisting of: feasibility study including de

  • Moroccan concentrated solar power plant hailed as shining example

    Efforts by the North African country to tap into the potential offered by renewable energy should be replicated at EU level, according to the head of a successful Moroccan energy agency.So successful has the country been in meeting its electricity needs that it has easily exceeded it’s planned 35 per cent renewable energy target and has now set itself a new target of 52 per cent by the year 2030.

  • Concentrating Solar Power costs are expected to fall by 79% by 2022

    CSP costs have already plummeted by 47% compared to 2010. It is likely that costs will continue their downward trajectory thanks to economies of scale, deployment in locations with better solar resources and lower costs of capital, according to a study by the International Renewable Energy Agency (IRENA)TheInternational Renewable Energy Agency (IRENA) conducted a study on theevolution of the level

  • Masen has extended the tender for the Noor Midelt II concentrated solar power project to October 2019

    The Moroccan Sustainable Energy Agency (Masen) has extended the deadline for the tender for the Noor Midelt II solar project to October 2019. The closing date for the call for expressions of interest was initially set at 16 September 2019.Independent power producers (IPPs) who are interested in the call fortenders for the Noor Midelt II solar project have a few additional weeks to complete their a

Upcoming Events

See more+

Project Updates

See more+

CONTACT US

Tex:+86-21-6111 0177

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news