NO.2-4-36


This page provides information on Solacor 1, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.

                                    

Project Overview
Project Name:Solacor 1
Country:Spain
Location:El Carpio (Córdoba)
Owner(s):Abengoa Solar (74%) 
JGC (26%)
Technology:Parabolic trough
Turbine Capacity:Net: 50.0 MW Gross: 50.0 MW
Status:Operational
Start Year:2012

                                                                                                                                                                                  

Background
Technology:Parabolic trough
Status:Operational
Country:Spain
City:El Carpio
Region:Córdoba
Lat/Long Location:37°54′ 54.0″ North, 4°30′ 9.0″ West
Land Area:110 hectares
Electricity Generation:100,000 MWh/yr (Estimated)
Start Production:2012/2/1
Construction Job-Years:450
Annual O&M Jobs:40
PPA/Tariff Type:Real Decreto 661/2007
PPA/Tariff Rate:27.0 Euro cents per kWh
PPA/Tariff Period:25 years
Project Type:Commercial
Participants
Developer(s):Abengoa Solar ; JGC
Owner(s) (%):Abengoa Solar (74%) 
JGC (26%)
EPC Contractor:Abener/Teyma
Operator(s):Abengoa Solar
SCA Manufacturer (Model):Abengoa Solar (ASTRØ)
HCE Manufacturer:Schott
Solar Field
Solar-Field Aperture Area:300,000 m²
# of Solar Collector  Assemblies (SCAs):360
# of SCAs per Loop:4
SCA Length:150 m
# of Modules per SCA:12
# of Heat Collector Elements  (HCEs):12,960
Heat-Transfer Fluid Type:Thermal Oil
Solar-Field Inlet Temp:293°C
Solar-Field Outlet Temp:393°C
Solar-Field Temp Difference:100°C
Power Block
Turbine Capacity (Gross):50.0 MW
Turbine Capacity (Net):50.0 MW
Output Type:Steam Rankine
Power Cycle Pressure:100.0 bar
Cooling Method:Wet cooling
Cooling Method Description:Cooling Towers
Fossil Backup Type:HTF Boiler
Thermal Storage
Storage Type:None


*Reference from NREL

More from CSP Focus

Next

Latest News

See more+
  • Demand for electrical energy in Spain falls 13.1% in May

    Wind energy represented 21.9% of the electricity demand in Spain in May, concentrated solar power 3.3% and photovoltaic energy 9, 3%. 52.5% of the monthly generation was from renewable sources and 70.8% were produced from technologies that do not emit CO2 equivalent. The demand for electrical energy decreased in the Balearic Islands by 31.3% and in the Canary Islands by 18.8% compared to the same

  • Renewables Increasingly Beat Even Cheapest Coal Competitors on Cost

    Competitive power generation costs make investment in renewables highly attractive as countries target economic recovery from COVID-19, new IRENA report finds.Renewable power is increasingly cheaper than any new electricity capacity based on fossil fuels, a new report by the International Renewable Energy Agency (IRENA) published today finds. Renewable Power Generation Costs in 2019 shows that mor

  • Portugal sets price caps for 700 MW solar auction

    Source: EBRD (www.ebrd.com)June 1 (Renewables Now) - The price ceilings for Portugals upcoming solar auction targeting 700 MW have been set at EUR 41.54 (USD 46.13) and EUR 41.73 per MWh depending on the lots, according to procedure documents released last week.Portugal is auctioning 12 lots in the southern regions of Algarve and Alentejo. On Friday, the government held its second information sess

  • Global Concentrating Solar Power Updates丨CSP Focus Monthly May 2020

    CSP Focus Monthly May 2020 Edition covering global concentrating solar power industry news.

Free Reports

See more+
  • Dubai 950MW NOOR Energy 1 CSP+PV Project

    The $4.4 billion Noor Energy 1 solar thermal project will be the world’s largest CSP plant and includes a 100 MW CSP tower plant, three 200 MW parabolic trough CSP systems, 250 MW of PV capacity and 15 hours of molten salt CSP storage capacity.

  • China Large-scale CSP Projects Update

    Updating--Jan., 2020 Edition24 pagesPart 1: Background and Fact Sheet (P1-11) · Implementation and adjustment of 1st batch of CSP demonstrations· FiT policy update and prediction· Sum-up on the 20 projects technology, location, ownership and key participants Part 2: Milestones of Ch

  • Suppliers List of China Key CSP Projects (Updating)

    13 key concentrated solar power projects in China undergoing:Shouhang Dunhuang 100MW Molten Salt Parabolic Trough ProjectRoyal Tech Yumen 50MW Parabolic Trough ProjectDCTC Dunhuang 50MW MS CLFR ProjectRayspower Yumen 50MW Trough ProjectCNNC Royal Tech Urad 100MW Parabolic Trough ProjectSupcon Delingha 50MW Molten Salt Tower ProjectLuNeng Haixi 50 MW Solar Thermal Tower Plant ProjectPower C

  • Construction and Operation of SUPCON SOLAR Delingha 50MW Tower CSP Project

    40 pages in totalCompany Profile (P3-4)Construction of Delingha 50MW Tower CSP Project (P6-17)Operation of Delingha 50MW Tower CSP Project (P18-30)Issues during Commissioning and Operation (P31-39)

Upcoming Events

See more+

CONTACT US

Tex:+86-21-6111 0177

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news