NO.2-4-43


This page provides information on Solaben 3, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.

                                    

Project Overview
Project Name:Solaben 3
Country:Spain
Location:Logrosán (Cáceres)
Owner(s):Abengoa (70%) 
ITOCHU (30%)
Technology:Parabolic trough
Turbine Capacity:Net: 50.0 MW Gross: 50.0 MW
Status:Operational
Start Year:2012

                                                                                                                                                                                      

Background
Technology:Parabolic trough
Status:Operational
Country:Spain
City:Logrosán
Region:Cáceres
Lat/Long Location:39°13′ 29.0″ North, 5°23′ 26.0″ West
Land Area:110 hectares
Electricity Generation:100,000 MWh/yr (Estimated)
Start Production:2012/6/1
Construction Job-Years:700
Annual O&M Jobs:85
PPA/Tariff Type:Real Decreto 661/2007
PPA/Tariff Rate:27.0 Euro cents per kWh
PPA/Tariff Period:25 years
PPA/Tariff Information:Feed-in Tariff
Project Type:Commercial
Participants
Developer(s):Abengoa ; ITOCHU
Owner(s) (%):Abengoa (70%) 
ITOCHU (30%)
EPC Contractor:Abener/Teyma
Operator(s):Abengoa
SCA Manufacturer (Model):Abengoa (ASTRØ)
HCE Manufacturer:Schott
Solar Field
Solar-Field Aperture Area:300,000 m²
# of Solar Collector  Assemblies (SCAs):360
# of SCAs per Loop:4
SCA Length:150 m
# of Modules per SCA:12
# of Heat Collector Elements  (HCEs):12,960
Heat-Transfer Fluid Type:Thermal Oil
Solar-Field Inlet Temp:293°C
Solar-Field Outlet Temp:393°C
Solar-Field Temp Difference:100°C
Power Block
Turbine Capacity (Gross):50.0 MW
Turbine Capacity (Net):50.0 MW
Output Type:Steam Rankine
Power Cycle Pressure:100.0 bar
Cooling Method:Wet cooling
Cooling Method Description:Cooling Towers
Fossil Backup Type:HTF Boiler
Thermal Storage
Storage Type:None


*Reference from NREL

More from CSP Focus

Next

Latest News

See more+
  • Copec inks PPA with Cerro Dominador Concentrated Solar Power plant

    Copec has signed a power purchase agreement (PPA) to secure electricity from the 210-MW Cerro Dominador combined photovoltaic (PV) and concentrated solar power (CSP) plant in Chile’s Atacama desert.The PPA enters into force in July 2020 and will run for five years, the project company Cerro Dominador said Tuesday, adding that it won the contract in Copec’s tender.The deal will enable Copec to co

  • Enerray has inaugurated the concentrated solar park CSP-ORC PLUS in Morocco

    Enerray has inaugurated the solar thermodynamic plant of the Green Energy Park in Ben Guerir, Morocco.The ORC-PLUS project, born on 01/06/2015, aims at developing an innovative Thermal Energy Storage system (TES) which is optimised for CSP plants in the scale of 1-5 MWe. This will improve the dispatchability (production on demand) and number of hours of production, regardless of sunlight availabil

  • Researchers develop new method to remove dust on solar panels

    Taking a cue from the self-cleaning properties of the lotus leaf, researchers at Ben-Gurion University of the Negev have shed new light on microscopic forces and mechanisms that can be optimized to remove dust from solar panels to maintain efficiency and light absorption. The new technique removed 98 percent of dust particles.In a new study published in Langmuir, the researchers confirmed that mod

  • EBRD grants €45 million loan for Noor Midelt I concentrated solar power project

    The European Bank for Reconstruction and Development (EBRD) has granted a €45 million loan for the construction of the Noor Midelt I hybrid concentrated solar power + PV plant. It will have a capacity of 800 MW.New funds have recently been allocated to the development of the Noor Midelt I hybrid solar project in central Morocco. It is a €45 million loan from the European Bank for Reconstruction an

Free Reports

See more+
  • Suppliers List of China Key CSP Projects (Updating)

    13 key concentrated solar power projects in China undergoing:Shouhang Dunhuang 100MW Molten Salt Parabolic Trough ProjectRoyal Tech Yumen 50MW Parabolic Trough ProjectDCTC Dunhuang 50MW MS CLFR ProjectRayspower Yumen 50MW Trough ProjectCNNC Royal Tech Urad 100MW Parabolic Trough ProjectSupcon Delingha 50MW Molten Salt Tower ProjectLuNeng Haixi 50 MW Solar Thermal Tower Plant ProjectPower C

  • China Large-scale CSP Projects Update

    Updating--Nov., 2019 Edition23 pagesPart 1: Background and Fact Sheet (P1-11) · Implementation and adjustment of 1st batch of CSP demonstrations· FiT policy update and prediction· Sum-up on the 20 projects’ technology, location, ownership and key participants Part 2: Milestones of

  • Construction and Operation of SUPCON SOLAR Delingha 50MW Tower CSP Project

    40 pages in totalCompany Profile (P3-4)Construction of Delingha 50MW Tower CSP Project (P6-17)Operation of Delingha 50MW Tower CSP Project (P18-30)Issues during Commissioning and Operation (P31-39)

  • BrightSource Engineering and Manufacturing System

    Engineering, Supply Chain, Construction, Business Intelligence. What about the Min O&M?

Upcoming Events

See more+

CONTACT US

Tex:+86-21-6111 0177

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news