中文  |  ENGLISH

Guzmán

<BACK

NO.2-4-46


This page provides information on Guzmán, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.

                                    

Project Overview
Project Name:Guzmán
Country:Spain
Location:Palma del Río (Córdoba)
Owner(s):FCC Energy (70%) 
Mitsui (30%)
Technology:Parabolic trough
Turbine Capacity:Net: 50.0 MW Gross: 50.0 MW
Status:Operational
Start Year:2012

                                                                                                                                                                                                      

Background
Technology:Parabolic trough
Status:Operational
Country:Spain
City:Palma del Río
Region:Córdoba
Lat/Long Location:37°9′ 7.0″ North, 5°16′ 16.0″ West
Land Area:200 hectares
Electricity Generation:104,000 MWh/yr (Estimated)
Break Ground:2010/7/1
Start Production:2012/7/1
PPA/Tariff Type:Real Decreto 661/2007
PPA/Tariff Rate:27.0 Euro cents per kWh
PPA/Tariff Period:25 years
PPA/Tariff Information:Feed-in Tariff
Project Type:Commercial
Participants
Developer(s):FCC Energy
Owner(s) (%):FCC Energy (70%) 
Mitsui (30%)
EPC Contractor:FCC, Abantia, SerIDOM (IDOM Group)
SCA Manufacturer (Model):Sener (SenerTrough)
Mirror Manufacturer (Model):Flabeg (RP3)
HCE Manufacturer (Model):Schott (PTR-70)
Turbine Manufacturer:Man-Turbo
Solar Field
Solar-Field Aperture Area:310,406 m²
# of Solar Collector  Assemblies (SCAs):384
# of Loops:96
# of SCAs per Loop:4
SCA Aperture Area:817 m²
SCA Length:150 m
# of Modules per SCA:12
# of Heat Collector Elements  (HCEs):13,824
Heat-Transfer Fluid Type:Dowtherm A
Solar-Field Inlet Temp:293°C
Solar-Field Outlet Temp:393°C
Solar-Field Temp Difference:100°C
Power Block
Turbine Capacity (Gross):50.0 MW
Turbine Capacity (Net):50.0 MW
Turbine Description:5 extractions
Output Type:Steam Rankine
Power Cycle Pressure:100.0 bar
Cooling Method:Wet cooling
Cooling Method Description:Cooling Towers
Fossil Backup Type:HTF Heaters (3x15MWt)
Backup Percentage:12%
Thermal Storage
Storage Type:None


*Reference from NREL

More from CSP Focus

Next

Latest News

See more+
  • InfraTec Automated Monitoring Solution SPTC——Thermography-based Solar Power Tower Monitoring System

    Automated Monitoring Solution SPTC——Thermography-based Solar Power Tower Monitoring System System DescriptionThe Solar Power Tower Check (SPTC) uses infrared technology to monitor the central absorber of a solar tower power plant. The temperature measurements are realised fully automated without the need of any manual interaction. SPTC automatically raises warnings and alarms as soon as an adj

  • Protermosolar: Concentrated Solar Power exceeds 5 TWh in 2019 in Spain

    Solar thermal energy has again exceeded 5 TWh of electricity generation by adding 5,166 GWh in 2019, representing an increase of 16.8% over 2018 and 3.8% compared to the average of the last 5 years.One more year, the concentrated solar power generation in Spain has proven its reliability, reaching punctual contributions of about 10% and 2.1% of the total electricity generation in Spain in 2019, co

  • China largest 100MW parabolic trough CSP plant connected to the grid

    CSNP Royal Tech Urat 100MW Parabolic Trough CSP Project was successfully connected to the gird at 22:49 p.m. on January 8th, 2020.

  • America’s Concentrated Solar Power Companies Have All but Disappeared

    SolarReserve, one of America’s last remaining Concentrated Solar Power developers, appears to have ceased operations — just as some global markets may be warming up.The Crescent Dunes CSP project in Nevada has undershot expectations. (Credit: SolarReserve)There are fears for one of America’s last two remaining concentrated solar power developers as the embattled sector attempts to pivot to a ne

Free Reports

See more+
  • China Large-scale CSP Projects Update

    Updating--Jan., 2020 Edition24 pagesPart 1: Background and Fact Sheet (P1-11) · Implementation and adjustment of 1st batch of CSP demonstrations· FiT policy update and prediction· Sum-up on the 20 projects technology, location, ownership and key participants Part 2: Milestones of Ch

  • Suppliers List of China Key CSP Projects (Updating)

    13 key concentrated solar power projects in China undergoing:Shouhang Dunhuang 100MW Molten Salt Parabolic Trough ProjectRoyal Tech Yumen 50MW Parabolic Trough ProjectDCTC Dunhuang 50MW MS CLFR ProjectRayspower Yumen 50MW Trough ProjectCNNC Royal Tech Urad 100MW Parabolic Trough ProjectSupcon Delingha 50MW Molten Salt Tower ProjectLuNeng Haixi 50 MW Solar Thermal Tower Plant ProjectPower C

  • Construction and Operation of SUPCON SOLAR Delingha 50MW Tower CSP Project

    40 pages in totalCompany Profile (P3-4)Construction of Delingha 50MW Tower CSP Project (P6-17)Operation of Delingha 50MW Tower CSP Project (P18-30)Issues during Commissioning and Operation (P31-39)

  • BrightSource Engineering and Manufacturing System

    Engineering, Supply Chain, Construction, Business Intelligence. What about the Min O&M?

Upcoming Events

See more+

CONTACT US

Tex:+86-21-6111 0177

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news