NO.2-4-48


This page provides information on Orellana, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.

                                  

Project Overview
Project Name:Orellana
Country:Spain
Location:Orellana (Badajoz)
Owner(s):Acciona (100%)
Technology:Parabolic trough
Turbine Capacity:Net: 50.0 MW Gross: 50.0 MW
Status:Operational
Start Year:2012

                                                                                                                                                

Background
Technology:Parabolic trough
Status:Operational
Country:Spain
City:Orellana
Region:Badajoz
Lat/Long Location:38°59′ 31.0″ North, 5°32′ 56.0″ West
Land Area:186 hectares
Electricity Generation:118,000 MWh/yr (Estimated)
Start Production:2012/8/1
Cost (approx):240,000,000 Euro
PPA/Tariff Type:Real Decreto 661/2007
PPA/Tariff Rate:27.0 Euro cents per kWh
PPA/Tariff Period:25 years
PPA/Tariff Information:Feed-in Tariff
Project Type:Commercial
Participants
Developer(s):Acciona
Owner(s) (%):Acciona (100%)
EPC Contractor:Sener
SCA Manufacturer (Model):Sener (SENERtrough)
Solar Field
Solar-Field Aperture Area:405,500 m²
# of Solar Collector  Assemblies (SCAs):416
# of Loops:124
Heat-Transfer Fluid Type:Thermal Oil
Solar-Field Inlet Temp:293°C
Solar-Field Outlet Temp:393°C
Solar-Field Temp Difference:100°C
Power Block
Turbine Capacity (Gross):50.0 MW
Turbine Capacity (Net):50.0 MW
Output Type:Steam Rankine
Cooling Method:Wet cooling
Thermal Storage
Storage Type:None


*Reference from NREL

More from CSP Focus

Next

Latest News

See more+
  • Lebanon calls for bid on consultancy services for a concentrated solar power plant

    The Lebanese Center for Energy Conservation(LCEC) has published a Request for Proposal (RFP) for Consultancy Services for the Development of a Concentrated Solar Power (CSP) Plant in Hermel Lebanon.The project will have a capacity of at least 50 MW with 7.5 hours of storage. The consultant will be in charge of the preparatory studies for the CSP plant, consisting of: feasibility study including de

  • Moroccan concentrated solar power plant hailed as shining example

    Efforts by the North African country to tap into the potential offered by renewable energy should be replicated at EU level, according to the head of a successful Moroccan energy agency.So successful has the country been in meeting its electricity needs that it has easily exceeded it’s planned 35 per cent renewable energy target and has now set itself a new target of 52 per cent by the year 2030.

  • Concentrating Solar Power costs are expected to fall by 79% by 2022

    CSP costs have already plummeted by 47% compared to 2010. It is likely that costs will continue their downward trajectory thanks to economies of scale, deployment in locations with better solar resources and lower costs of capital, according to a study by the International Renewable Energy Agency (IRENA)TheInternational Renewable Energy Agency (IRENA) conducted a study on theevolution of the level

  • Masen has extended the tender for the Noor Midelt II concentrated solar power project to October 2019

    The Moroccan Sustainable Energy Agency (Masen) has extended the deadline for the tender for the Noor Midelt II solar project to October 2019. The closing date for the call for expressions of interest was initially set at 16 September 2019.Independent power producers (IPPs) who are interested in the call fortenders for the Noor Midelt II solar project have a few additional weeks to complete their a

Free Reports

See more+
  • BrightSource Engineering and Manufacturing System

    Engineering, Supply Chain, Construction, Business Intelligence. What about the Min O&M?

  • Yumen Xinneng 50MW Molten Salt Tower CSP Project

    The project broke ground in June 2017, and 3 of the 15 modules are expected to be connected to the gird by the end of September, 2019. It will be the first large‐scale commercial CSP plant in the world taking innovative beam-down molten salt tower CSP technology.

  • Luneng Haixi 50MW Molten Salt Tower CSP Project

    With total capacity of700MW, Luneng Haixi Geermu Multi-energy Complement Integration OptimizationPilot Project consists of 200MW PV, 400MW Wind, 50MW CSP and 50MW energystorage system. Updating--Jan., 2019 Edition1. Overview (P2)2. Highlights (P2)3. Fast sheet (P3)4. Project Milestones (P4)5. Project Participants 5.1. Developer (P5) 5.2. Owner&Investor (P5) 5.3. EPC Contractor (P5)

  • Suppliers List of China Key CSP Projects (Updating)

    13 key concentrated solar power projects in China undergoing:Shouhang Dunhuang 100MW Molten Salt Parabolic Trough ProjectRoyal Tech Yumen 50MW Parabolic Trough ProjectDCTC Dunhuang 50MW MS CLFR ProjectRayspower Yumen 50MW Trough ProjectCNNC Royal Tech Urad 100MW Parabolic Trough ProjectSupcon Delingha 50MW Molten Salt Tower ProjectLuNeng Haixi 50 MW Solar Thermal Tower Plant ProjectPower C

Upcoming Events

See more+

CONTACT US

Tex:+86-21-6111 0177

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news