The planned project, located at Maria Elena in the Antofagasta region, is a 360 MW plant divided in two phases (I and II) which in turn are divided into two 90 MW units. The plant will use parabolic trough technology with thermal storage. The expected generation is up to 2,108 GWh per year.

                                  

Project Overview
Project Name:Pedro de Valdivia
Country:Chile
Location:Maria Elena (Antofagasta)
Owner(s):Grupo Ibereolica (100%)
Technology:Parabolic trough
Turbine Capacity:Net: 360.0 MW Gross: 360.0 MW
Status:Under development
Start Year:2015

                                                                                                                                

Background
Technology:Parabolic trough
Status:Under development
Country:Chile
City:Maria Elena
Region:Antofagasta
Lat/Long Location:22°43′ 4.0″ South, 69°35′ 10.0″ West
Land Area:1,982 hectares
Electricity Generation:2,108,000 MWh/yr (Estimated)
Break Ground:2012/10/1
Start Production:2015
Cost (approx):2,610,000,000 USD
Project Type:Commercial
Participants
Developer(s):Grupo Ibereolica
Owner(s) (%):Grupo Ibereolica (100%)
Solar Field
# of Solar Collector  Assemblies (SCAs):5,376
# of Loops:1344
# of SCAs per Loop:4
Heat-Transfer Fluid Type:Thermal Oil
Solar-Field Inlet Temp:293°C
Solar-Field Outlet Temp:393°C
Power Block
Turbine Capacity (Gross):360.0 MW
Turbine Capacity (Net):360.0 MW
Cooling Method:Dry cooling
Fossil Backup Type:Natural gas
Thermal Storage
Storage Type:2-tank indirect
Storage Capacity:10.5 hours
Thermal Storage Description:Molten Salt


*Reference from NREL

More from CSP Focus

Next

Latest News

See more+

Free Reports

See more+
  • Dubai 950MW NOOR Energy 1 CSP+PV Project

    The $4.4 billion Noor Energy 1 solar thermal project will be the world’s largest CSP plant and includes a 100 MW CSP tower plant, three 200 MW parabolic trough CSP systems, 250 MW of PV capacity and 15 hours of molten salt CSP storage capacity.

  • China Large-scale CSP Projects Update

    Updating--Jan., 2020 Edition24 pagesPart 1: Background and Fact Sheet (P1-11) · Implementation and adjustment of 1st batch of CSP demonstrations· FiT policy update and prediction· Sum-up on the 20 projects technology, location, ownership and key participants Part 2: Milestones of Ch

  • Suppliers List of China Key CSP Projects (Updating)

    13 key concentrated solar power projects in China undergoing:Shouhang Dunhuang 100MW Molten Salt Parabolic Trough ProjectRoyal Tech Yumen 50MW Parabolic Trough ProjectDCTC Dunhuang 50MW MS CLFR ProjectRayspower Yumen 50MW Trough ProjectCNNC Royal Tech Urad 100MW Parabolic Trough ProjectSupcon Delingha 50MW Molten Salt Tower ProjectLuNeng Haixi 50 MW Solar Thermal Tower Plant ProjectPower C

  • Construction and Operation of SUPCON SOLAR Delingha 50MW Tower CSP Project

    40 pages in totalCompany Profile (P3-4)Construction of Delingha 50MW Tower CSP Project (P6-17)Operation of Delingha 50MW Tower CSP Project (P18-30)Issues during Commissioning and Operation (P31-39)

Upcoming Events

See more+

CONTACT US

Tex:+86-21-6111 0177

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news