Kuwait Shagaya 50MW Parabolic Trough CSP Project

<BACK

   2019-5-28


Project Fact Sheet


Technology: Parabolic trough

Capacity: 50.00 MW

DNI: 1950 kwh/m2


Electricity Guarantee (MWh/a): 180, 000

Purpose: Demonstration

Location: Shagaya Renewable Energy Park, 100 kilometers (60 miles) 

west of Kuwait City, Kuwait


Storage type: Two tank indirect - molten salts

Storage Capacity : 10 hours, 1200 MWh

EPC Contract Signed Time: 12 Sept. 2015

Commercial Operation Day: Oct. 17, 2018


Total Cost (MKD): 116.5

LCOE ($c/kWh): 16

Reflector Technology: SKAL-ET (based on Eurothrough collector)


SCAs per Loop: 4, 206 loops in total

Aperture Area: 673, 620 m2

Cooling: Dry

Backup: Yes


  Full report (Member Only)


Project Overview


It is the first utility-scale CSP project in Kuwait. KISR opted for parabolic trough technology, with 10 hours of thermal energy storage (TES) using molten salt, and a dry cooling system to minimize water consumption.


Backup fossil fuel may be implemented only for operational purposes; the fuel foreseen is light fuel-oil which will be transported to the site via tankers. Water will be carried out to the plant by road tankers.


The CSP project with Thermal Energy Storage (TES) is important to cover peak demand periods. And it will enable Kuwait to assess the performance of this technology under local climate conditions.

                   

Project Participants

  

Apply CSP Focus Membership to see full report

                                                            

 Plant photos





More from CSP Focus

Next

Latest News

See more+
  • Dubai’s concentrated solar power project starts supplying electricity to the grid

    On November 29 (Dubai Time), the Trough Unit No. 1 facility of Shanghai Electric’s 700MW solar thermal and 250MW photovoltaic solar power plant in Dubai has successfully achieved grid-connected electricity generation, marking a significant milestone along the path of the firm’s entry into the renewable energy sector. The facility is already delivering top-notch technical parameters and reliable

  • Four bidders shortlisted for 200MW solar plant

    The plant, which will use lenses or mirrors to focus a large area of sunlight onto a receiver, is due to be operational by 2027 and is the flagship renewable project in government’s Integrated Resources Plan (IRP) for energy development in the years to 2040.On Tuesday, the Ministry of Minerals and Energy published a shortlist of four bidders who include major global players with thousands of mega

  • CSP Project Tenders Last Week (Nov.14-20)

    Project Construction Supervision Bidding- POWERCHINA Ruoqiang 100MW CSP + 900MW PV ProjectOn Nov. 14, POWERCHINA Renewable Energy Co., Ltd issued a tender announcement for the construction supervision of the POWERCHINA Ruoqiang 100MW CSP + 900MW PV Project. According to the announcement, the owner of POWERCHINA Ruoqiang 100MW CSP + 900MW PV Project is POWERCHINA Ruoqiang Ruida Energy Development C

  • CSP Project Tenders Last Two Week (Nov. 1-13)

    Vacuum Pump Tender- Akesai Huidong New Energy CSP + PV Pilot ProjectOn November 7, East China Electric Power Design Institute Co., Ltd. of China Power Engineering Consulting Group issued a procurement announcement for vacuum pumps for the Akesai Huidong New Energy CSP + PV Pilot Project.Latest Milestone- Akesai Huidong New Energy CSP + PV Pilot ProjectAccording to the Aksai County Government, the

Reports(Member Only)

See more+

Upcoming Events

See more+

CONTACT US

Tex:

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news