This page provides information on Solar Electric Generating Station I, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration. SEGS I is one of the nine Solar Electric Generating Station plants in California’s Mojave Desert. The combined electric generating capacity of these plants, which use parabolic trough technology, is more than 350 megawatts. The plants operate as Qualifying Facility Independent Power Producers under the Public Utility Regulatory Policies Act, with a special Standard Offer 2 type of power purchase agreement to Southern California Edison. Initially, the entire plant had three hours of thermal energy storage for dispatching electricity during periods of peak demand. However, a fire in 1999 damaged the storage system and it was not replaced.

                                  

Project Overview
Project Name:Solar Electric Generating Station I (SEGS I)
Country:United States
Location:Daggett, California (Mojave Desert)
Owner(s):Cogentrix (100%)
Technology:Parabolic trough
Turbine Capacity:Net: 13.8 MW Gross: 13.8 MW
Status:Operational
Start Year:1984

                                                                                                                                                

Background
Technology:Parabolic trough
Status:Operational
Country:United States
City:Daggett
State:California
County:San Bernardino
Region:Mojave Desert
Lat/Long Location:34°51′ 47.0″ North, 116°49′ 37.0″ West
Solar Resource:2,725 kWh/m2/yr
Source of Solar Resource:National Solar Resource Data Base
Start Production:1984/12/20
Project Type:PURPA Qualifying Facility  Independent Power Producer, with special Standard Offer 2 (SO-2) type power  purchase agreement to Southern California Edison
Incentives:Accelerated depreciation 
Federal and state investment  incentive 
Solar property tax exclusion
Participants
Developer(s):Luz
Owner(s) (%):Cogentrix (100%)
Operator(s):Cogentrix
Generation Offtaker(s):Southern California Edison
SCA Manufacturer (Model):Luz (LS-1)
Solar Field
Solar-Field Aperture Area:82,960 m²
SCA Description:Parabolic trough SCA
Solar-Field Outlet Temp:307°C
Power Block
Turbine Capacity (Gross):13.8 MW
Turbine Capacity (Net):13.8 MW
Output Type:MHI regenerative steam turbine
Power Cycle Pressure:40.0 bar
Turbine Efficiency:31.5% @ full load
Fossil Backup Type:None
Thermal Storage
Storage Type:2-tank direct
Storage Capacity:3 hour(s)
Thermal Storage Description:Storage system was damaged by  fire in 1999 and was not replaced


*Reference from NREL

Latest News

See more+
  • Confirmed Speakers and Panelists of 11th CSP Focus China 2021

    We are pleased to announce 11th CSP Focus China 2021, which will be held on Oct. 28-29 in Beijing, China this year.The conference will be ON LINE too, with instant bilingual translation, given the constraints of international travel currently.Confirmed Speakers and Panelists:Ms. Jingli Shi, Researcher, Energy Research Institute, NDRCMr. Jixue Wang, Deputy Director of RE Center, EPPEIMr. Yanglong D

  • 247SOLAR CEO BRUCE ANDERSON TO INTRODUCE NEXT GENERATION LOW-COST CSP

    Great Falls, VA, USA Bruce Anderson, CEO of 247Solar Inc., will speak at the International CSP Focus 2021 Conference in Beijing, China on Friday, October 29, 2021. There he will present new modular, ultra-high temperature CSP technology that makes the unique round-the-clock benefits of CSP available at costs that rival daytime-only PV.For context: CSP has long offered unique benefits to the renewa

  • Qinghai 3*100MW CSP Bids Winner Announced - Coal and Oil Giants Grasp CSP

    Qinghai Province, China. 28 Sept, 2021. Qinghai Government announced the winners of a total capacity of 5.3GW RE auctions today, among which 3*100MW of CSP projects, 3.5GW PV and 1.5GW Wind, slightly different from the previous RFP document, in which there are 3*100MW of CSP projects, 3.8GW PV and 1.2GW Wind. Project Allocations3 companies and 4 consortia companies wins the bids, as was shown on t

  • Bids Open - 2*100MW CSP Included in Jilin China

    Jilin Province, China.Sept 23rd, four bidders (consortia) won the auction of a total capacity of 1.4GW RE projects, among which 2*100MW CSP Projects were included. The winners are State Power Investment Corporation (SPIC) & Zhejiang Zhongguang New Energy for Bid One, Power China for Bid Two, China General Nuclear Group (CGN) & Baicheng Energy Investment Development for Bid Three, and China

Free Reports

See more+
  • Dubai 950MW NOOR Energy 1 CSP+PV Project

    The $4.4 billion Noor Energy 1 solar thermal project will be the world’s largest CSP plant and includes a 100 MW CSP tower plant, three 200 MW parabolic trough CSP systems, 250 MW of PV capacity and 15 hours of molten salt CSP storage capacity.

  • China Large-scale CSP Projects Update

    Updating--Jan., 2020 Edition24 pagesPart 1: Background and Fact Sheet (P1-11) · Implementation and adjustment of 1st batch of CSP demonstrations· FiT policy update and prediction· Sum-up on the 20 projects technology, location, ownership and key participants Part 2: Milestones of Ch

  • Suppliers List of China Key CSP Projects (Updating)

    13 key concentrated solar power projects in China undergoing:Shouhang Dunhuang 100MW Molten Salt Parabolic Trough ProjectRoyal Tech Yumen 50MW Parabolic Trough ProjectDCTC Dunhuang 50MW MS CLFR ProjectRayspower Yumen 50MW Trough ProjectCNNC Royal Tech Urad 100MW Parabolic Trough ProjectSupcon Delingha 50MW Molten Salt Tower ProjectLuNeng Haixi 50 MW Solar Thermal Tower Plant ProjectPower C

  • Construction and Operation of SUPCON SOLAR Delingha 50MW Tower CSP Project

    40 pages in totalCompany Profile (P3-4)Construction of Delingha 50MW Tower CSP Project (P6-17)Operation of Delingha 50MW Tower CSP Project (P18-30)Issues during Commissioning and Operation (P31-39)

Upcoming Events

See more+

CONTACT US

Tex:+86-21-6111 0177

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news