This page provides information on Solar Electric Generating Station III, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration. SEGS III is one of the nine Solar Electric Generating Station plants in California’s Mojave Desert. The combined electric generating capacity of these plants, which use parabolic trough technology, is more than 350 megawatts. The plants operate as Qualifying Facility Independent Power Producers under the Public Utility Regulatory Policies Act, with a special Standard Offer 2 type of power purchase agreement to Southern California Edison.

                                  

Project Overview
Project Name:Solar Electric Generating Station III (SEGS III)
Country:United States
Location:Kramer Junction, California (Mojave Desert)
Owner(s):NextEra (50%)
Technology:Parabolic trough
Turbine Capacity:Net: 30.0 MW Gross: 33.0 MW
Status:Operational
Start Year:1985

                                                                                                                                        

Background
Technology:Parabolic trough
Status:Operational
Country:United States
City:Kramer Junction
State:California
County:San Bernardino
Region:Mojave Desert
Lat/Long Location:35°0′ 51.0″ North, 117°33′ 32.0″ West
Solar Resource:2,725 kWh/m2/yr
Source of Solar Resource:National Solar Resource Data Base
Start Production:1985/12/31
Project Type:PURPA Qualifying Facility  Independent Power Producer, with special Standard Offer 2 (SO-2) type power  purchase agreement to Southern California Edison
Incentives:Accelerated depreciation 
Federal and state investment  incentive 
Solar property tax exclusion
Participants
Developer(s):Luz
Owner(s) (%):NextEra (50%)
Operator(s):NextEra
Generation Offtaker(s):Southern California Edison
SCA Manufacturer (Model):Luz (LS-2)
HCE Manufacturer (Model):Solel Solar Systems (Solel UVAC)
Solar Field
Solar-Field Aperture Area:230,300 m²
SCA Description:Parabolic trough SCA
HCE Type (Length):Evacuated (4 m)
Heat-Transfer Fluid Type:Therminol
Solar-Field Outlet Temp:349°C
Power Block
Turbine Capacity (Gross):33.0 MW
Turbine Capacity (Net):30.0 MW
Power Cycle Pressure:40.0 bar
Turbine Efficiency:30.6% @ full load
Fossil Backup Type:Natural gas


*Reference from NREL

More from CSP Focus

Next

Latest News

See more+
  • CAPTure Testing in a “real world” environment

    By the end of 2019 the testing of the CAPTure prototype started at Plataforma Solar de Almería. In January 2020, part of the air solar receiver unit is successfully running and the next steps will focus on the testing of the other components of the prototype assembled at Plataforma Solar de Almería in 2019.The innovative pressurized air solar receiver unit, composed of an open volumetric

  • SALT FUSION WORK ON CERRO DOMINADOR THERMOSOLAR PLANT STARTED

    The pioneering Cerro Dominador solar thermal project has culminated another important phase in its development process with the start of salt fusion works.This project, in which MMYPEM participates, aims to build a 100MW photovoltaic plant and the first solar thermal plant in Latin America, which will have another 110MW of capacity and 17.5 hours of thermal storage.The salts function as a storage

  • Concentrated Solar Power is the way forward for Australia despite hiccups

    As the world looks to Germany as a shining example of how to shift away from polluting coal power, a Queensland-based nuclear expert says solar thermal power is the way forward for Australia.Paul Wilson, a nuclear engineer with almost five decades’ experience, told ABC Radio Brisbane’s Steve Austin he was disappointed Australia was not showing leadership or innovation in renewables.«We’re

  • Why thinking small could help reignite the concentrated solar power sector

    Concentrated solar power accounts for only a fraction of the overall green energy market, but recent research suggests smaller-scale designs could help revitalise interest in the sector. We talk to Luis Crespo, president of Protermosolar, Spain’s solar thermal electricity association.With demand for clean, affordable energy spiking around the world, it may seem counterintuitive to suggest that sc

Free Reports

See more+
  • China Large-scale CSP Projects Update

    Updating--Jan., 2020 Edition24 pagesPart 1: Background and Fact Sheet (P1-11) · Implementation and adjustment of 1st batch of CSP demonstrations· FiT policy update and prediction· Sum-up on the 20 projects technology, location, ownership and key participants Part 2: Milestones of Ch

  • Suppliers List of China Key CSP Projects (Updating)

    13 key concentrated solar power projects in China undergoing:Shouhang Dunhuang 100MW Molten Salt Parabolic Trough ProjectRoyal Tech Yumen 50MW Parabolic Trough ProjectDCTC Dunhuang 50MW MS CLFR ProjectRayspower Yumen 50MW Trough ProjectCNNC Royal Tech Urad 100MW Parabolic Trough ProjectSupcon Delingha 50MW Molten Salt Tower ProjectLuNeng Haixi 50 MW Solar Thermal Tower Plant ProjectPower C

  • Construction and Operation of SUPCON SOLAR Delingha 50MW Tower CSP Project

    40 pages in totalCompany Profile (P3-4)Construction of Delingha 50MW Tower CSP Project (P6-17)Operation of Delingha 50MW Tower CSP Project (P18-30)Issues during Commissioning and Operation (P31-39)

  • BrightSource Engineering and Manufacturing System

    Engineering, Supply Chain, Construction, Business Intelligence. What about the Min O&M?

Upcoming Events

See more+

CONTACT US

Tex:+86-21-6111 0177

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news