Kogan Creek Solar Boost project is set to become the largest solar integration with a coal-fired power station in the world. The project consist of a CLFR solar thermal augmentation of the existing Kogan Creek Power Station, increasing the power station’s electrical output and fuel efficiency. The solar addition will enable the 750 megawatt power station, already one of Australia’s most efficient coal-fired power stations and Australia’s largest single unit, to produce more electricity with the same amount of coal. The project will help avoid 35,600 tonnes of carbon dioxide per year, the equivalent to taking 11,000 cars of the road annually.

                                 

Project Overview

Project Name:

Kogan Creek Solar Boost (Kogan Creek)

Country:

Australia

Location:

Chinchilla (Queensland)

Owner(s):

CS Energy (100%)

Technology:

Linear Fresnel reflector

Turbine Capacity:

Net: 44.0 MW  Gross: 44.0 MW

Status:

Currently Non-Operational

Start Year:

2016

                                                                                                                                                                                                         

Background
Technology:Linear Fresnel reflector
Status:Currently Non-Operational
Country:Australia
City:Chinchilla
Region:Queensland
Lat/Long Location:26°55′8.0″ South, 150°45′ 28.0″ East
Land Area:30 hectares
Electricity Generation:44,000 MWh/yr
Generation Data Explanation:The generation data is based on  projected solar-derived steam generation with an appropriate thermal cycle  efficiency applied, considering the solar steam is being injected into the  Cold Reheat line of the existing power station.
Break Ground:2011/6/1
Start Production:2016
Cost (approx):105 AU$ million
PPA/Tariff Information:The solar-derived generation  will be traded in Australia’s National Electricity Market as part of the  power station’s overall output.
Project Type:Commercial
Participants
Developer(s):CS Energy
Owner(s) (%):CS Energy (100%)
EPC Contractor:AREVA Solar & Clyde Babcock-Hitachi Pty Ltd
Operator(s):CS Energy
Generation Offtaker(s):National Electricity Market
Collector Manufacturer  (Model) :AREVA Solar (CLFR)
Mirror Manufacturer :AREVA Solar
Receiver Manufacturer :AREVA Solar
Turbine Manufacturer:Siemens
Solar Field
# of Lines:14
Line Length:500 m
Mirror Width in Line:36 m
Collector Description:Once-through receiver delivering superheated steam
Heat-Transfer Fluid Type:Water/Steam
Solar-Field Inlet Temp:186°C
Solar-Field Outlet Temp:370°C
Power Block
Turbine Capacity (Gross):44.0 MW
Turbine Capacity (Net):44.0 MW
Output Type:Steam Rankine
Power Cycle Pressure:60.0 bar
Cooling Method:Dry cooling
Cooling Method Description:Air-Cooled Condenser
Thermal Storage
Storage Type:None



* Reference from NREL  

More from CSP Focus

Next

Latest News

See more+
  • Dubai’s concentrated solar power project starts supplying electricity to the grid

    On November 29 (Dubai Time), the Trough Unit No. 1 facility of Shanghai Electric’s 700MW solar thermal and 250MW photovoltaic solar power plant in Dubai has successfully achieved grid-connected electricity generation, marking a significant milestone along the path of the firm’s entry into the renewable energy sector. The facility is already delivering top-notch technical parameters and reliable

  • Four bidders shortlisted for 200MW solar plant

    The plant, which will use lenses or mirrors to focus a large area of sunlight onto a receiver, is due to be operational by 2027 and is the flagship renewable project in government’s Integrated Resources Plan (IRP) for energy development in the years to 2040.On Tuesday, the Ministry of Minerals and Energy published a shortlist of four bidders who include major global players with thousands of mega

  • CSP Project Tenders Last Week (Nov.14-20)

    Project Construction Supervision Bidding- POWERCHINA Ruoqiang 100MW CSP + 900MW PV ProjectOn Nov. 14, POWERCHINA Renewable Energy Co., Ltd issued a tender announcement for the construction supervision of the POWERCHINA Ruoqiang 100MW CSP + 900MW PV Project. According to the announcement, the owner of POWERCHINA Ruoqiang 100MW CSP + 900MW PV Project is POWERCHINA Ruoqiang Ruida Energy Development C

  • CSP Project Tenders Last Two Week (Nov. 1-13)

    Vacuum Pump Tender- Akesai Huidong New Energy CSP + PV Pilot ProjectOn November 7, East China Electric Power Design Institute Co., Ltd. of China Power Engineering Consulting Group issued a procurement announcement for vacuum pumps for the Akesai Huidong New Energy CSP + PV Pilot Project.Latest Milestone- Akesai Huidong New Energy CSP + PV Pilot ProjectAccording to the Aksai County Government, the

Reports(Member Only)

See more+

Upcoming Events

See more+

CONTACT US

Tex:

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news