CGN Delingha 50MW Thermal Oil Parabolic Trough project

<BACK

   2018-2-26


 Project Schedule


● November 2017, 90% of solar field completed; 

● April 2016, HTF & TES started contruction;

● July 2014, broke ground officially;

● February 2013, approved by the local Qinghai Province government;

● July 2012, signed MoU with Asian Development Bank on CSP project;

● April 2012, CGN Delingha Solar Energy Co., Ltd built CSP technology demonstration base;


  Progress expectation:


● March 2018,connected to the grid.


 Project Overview


CGN Solar Delingha 50MW parabolic trough CSP plant is among China 1st batch of 20 pilot CSP projects and leading the construction progress. With total investment of RMB 1.938 billion, the project is equipped with 9 hours molten salt thermal energy storage. Once completed, CGN Solar Delingha 50MW parabolic trough CSPplant will be the first commercial parabolic trough project, and the first operational pilot CSP project in China.


Basic information

Location

West exit solar energy industrial parks, Delingha, Qinghai province

Occupied area

2.5 km2

Investment

1.94 billion RMB

Life cycle
25 years
Natural gas consumption9%
Heat transfer fluid type
High temperature heat transfer boiler
Thermal enery storage
Molten salt,9h
Thermal enery storage modemixed nitrate
Collector technology
Euro Trough 150
# of Loops190
Per loop length600 m
Annual generating capacity225 million kwh
Annual water consumption800,000 ton(water cooling)











Project Participants

                                                 

Product/Service

Company

Basic engineering

TSK Energy  Solution

Solar field detailed engineering

TSK Energy  Solution

Technology  Provider of Euro Trough

Schlaich Bergermann Partner

Feasibility study

NWEPDI Northwest  Electric Power Design Institute 

Owner’s Engineer

AF Consult

Solar field EPC

Beijing Shouhang  IHW Energy Saving & SEPCOII

HTF&TES EPC

Shandong Sunway  Petrochemical Engineering Co., Ltd

Basic and detailed design of the thermal energy stroage system
IDOM

Power block EPC

NWEPDI Northwest  Electric Power Design Institute

Reflector

Rioglass

Receiver tube

Rioglass

HTF

Solutia

Sodium nitrate

Xinjiang Nitre  Potash Co., Ltd.

Potassium nitrate

Wentong

HTF pump

Sulzer

Molten  Salt pump

Sulzer

Turbine

Dongfang Turbine

Oil-water heat exchanger

Harbin Turbine

Molten-Salt heat  exchanger

Wuxi Chemical Equipment, Co., Ltd

                                                                                                                                                                                     

 Plant photos

Latest News

See more+
  • First heliostat field made in Brazil

    The University of São Paulo in Pirassununga (see photo) is about to get its own field of heliostats on campus. Once completed, the sea of mirrors will focus sunlight onto a receiver connected to an Organic Rankine Cycle system. The heat transfer fluid will be ambient air. The ORC turbine ‘waste’, hot water at 90 °C, will be directed to a nearby abattoir. The demonstration plant is part of SMILE, which is short for Solar-Hybrid Microturbine Systems for Cogeneration in Agro-Industrial Electricity and Heat Production.

  • How California's Winter Months Are Making CSP Look Bad

    Winter clouds may help the Mojave Desert bloom but they can be a burden for concentratedsolarpower (CSP), Energy Information Administration figures show.

  • DOE announces $105.5 million in funding to advance solar energy technologies

    U.S. Secretary of Energy Rick Perry announced up to $105.5 million to support America’s continued leadership in energy innovation through solar technology. Under the Department of Energy’s (DOE’s) Solar Energy Technologies Office (SETO), DOE will fund about 70 projects to advance both solar PV and concentrating solar thermal power (CSP) technologies, as well as facilitate the secure integration of those technologies into the nation’s electricity grid. Funding will also support efforts that prepare the workforce for the solar industry’s future needs.

  • China's ICBC lead arranger for$1.5 bn to finance Dubai 700MW Concentrated Solar Power Project

    Dubai Electricity and Water Authority (DEWA) in September awarded the contract to build the 700-megawatt (MW) project in Dubai costing $3.87 billion to ACWA Power and China’s Shanghai Electric.

Free Reports

See more+

Upcoming Events

See more+

CONTACT US

Tex:+86-21-6111 0177

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news