This page provides information on AUGUSTIN FRESNEL 1, a concentrating solar power (CSP) pilot project, with data organized by background, participants, and power plant configuration. AUGUSTIN FRESNEL 1 is a Linear Fresnel Reflector (LFR) project. Located in Targassonne in the South of France, AUGUSTIN FRESNEL 1 began construction in August 2011 and entered in operations in January 2012.

                                  

Project Overview
Project Name:Augustin Fresnel 1
Country:France
Location:Targassonne (Pyreneans)
Owner(s):Solar Euromed (100%)
Technology:Linear Fresnel reflector
Turbine Capacity:Net: 0.25 MW Gross: 0.25 MW
Status:Operational
Start Year:2012

                                                                                                                                                                                    

Background
Technology:Linear Fresnel reflector
Status:Operational
Country:France
City:Targassonne
Region:Pyreneans
Lat/Long Location:42°30′ 4.0″ North, 1°58′ 20.0″ East
Land Area:1 hectares
Solar Resource:1,800 kWh/m2/yr
Source of Solar Resource:Meteo Station
Break Ground:2011/8/1
Start Production:2012/1/1
Construction Job-Years:10
Annual O&M Jobs:3
Project Type:Prototype
Incentives:French Goverment Co-funding
Participants
Developer(s):Solar Euromed
Owner(s) (%):Solar Euromed (100%)
EPC Contractor:Solar Euromed
Operator(s):Solar Euromed
Collector Manufacturer  (Model) :Solar Euromed (AF1)
Mirror Manufacturer (Model) :Solar Euromed (AF1)
Mirror Manufacturer (Model) :(AF1)
Receiver Manufacturer (Model)  :Solar Euromed (AF1)
Solar Field
Solar-Field Aperture Area:400 m²
# of Lines:1
Line Length:40 m
# of Mirrors across Line:12
Collector Description:Liner Fresnel Reflectors
Receiver Type:Non-evacuated
Receiver Length:40 m
Heat-Transfer Fluid Type:Water
Solar-Field Outlet Temp:300°C
Power Block
Turbine Capacity (Gross):0.25 MW
Turbine Capacity (Net):0.25 MW
Output Type:Steam Rankine
Power Cycle Pressure:100.0 bar
Cooling Method:Dry cooling
Thermal Storage
Storage Type:Other
Storage Capacity:0.25 hours
Thermal Storage Description:Ruths tank


*Reference from NREL

More from CSP Focus

Next

Latest News

See more+
  • Confirmed Speakers and Panelists of 11th CSP Focus China 2021

    We are pleased to announce 11th CSP Focus China 2021, which will be held on Oct. 28-29 in Beijing, China this year.The conference will be ON LINE too, with instant bilingual translation, given the constraints of international travel currently.Confirmed Speakers and Panelists:Ms. Jingli Shi, Researcher, Energy Research Institute, NDRCMr. Jixue Wang, Deputy Director of RE Center, EPPEIMr. Yanglong D

  • 247SOLAR CEO BRUCE ANDERSON TO INTRODUCE NEXT GENERATION LOW-COST CSP

    Great Falls, VA, USA Bruce Anderson, CEO of 247Solar Inc., will speak at the International CSP Focus 2021 Conference in Beijing, China on Friday, October 29, 2021. There he will present new modular, ultra-high temperature CSP technology that makes the unique round-the-clock benefits of CSP available at costs that rival daytime-only PV.For context: CSP has long offered unique benefits to the renewa

  • Qinghai 3*100MW CSP Bids Winner Announced - Coal and Oil Giants Grasp CSP

    Qinghai Province, China. 28 Sept, 2021. Qinghai Government announced the winners of a total capacity of 5.3GW RE auctions today, among which 3*100MW of CSP projects, 3.5GW PV and 1.5GW Wind, slightly different from the previous RFP document, in which there are 3*100MW of CSP projects, 3.8GW PV and 1.2GW Wind. Project Allocations3 companies and 4 consortia companies wins the bids, as was shown on t

  • Bids Open - 2*100MW CSP Included in Jilin China

    Jilin Province, China.Sept 23rd, four bidders (consortia) won the auction of a total capacity of 1.4GW RE projects, among which 2*100MW CSP Projects were included. The winners are State Power Investment Corporation (SPIC) & Zhejiang Zhongguang New Energy for Bid One, Power China for Bid Two, China General Nuclear Group (CGN) & Baicheng Energy Investment Development for Bid Three, and China

Free Reports

See more+
  • Dubai 950MW NOOR Energy 1 CSP+PV Project

    The $4.4 billion Noor Energy 1 solar thermal project will be the world’s largest CSP plant and includes a 100 MW CSP tower plant, three 200 MW parabolic trough CSP systems, 250 MW of PV capacity and 15 hours of molten salt CSP storage capacity.

  • China Large-scale CSP Projects Update

    Updating--Jan., 2020 Edition24 pagesPart 1: Background and Fact Sheet (P1-11) · Implementation and adjustment of 1st batch of CSP demonstrations· FiT policy update and prediction· Sum-up on the 20 projects technology, location, ownership and key participants Part 2: Milestones of Ch

  • Suppliers List of China Key CSP Projects (Updating)

    13 key concentrated solar power projects in China undergoing:Shouhang Dunhuang 100MW Molten Salt Parabolic Trough ProjectRoyal Tech Yumen 50MW Parabolic Trough ProjectDCTC Dunhuang 50MW MS CLFR ProjectRayspower Yumen 50MW Trough ProjectCNNC Royal Tech Urad 100MW Parabolic Trough ProjectSupcon Delingha 50MW Molten Salt Tower ProjectLuNeng Haixi 50 MW Solar Thermal Tower Plant ProjectPower C

  • Construction and Operation of SUPCON SOLAR Delingha 50MW Tower CSP Project

    40 pages in totalCompany Profile (P3-4)Construction of Delingha 50MW Tower CSP Project (P6-17)Operation of Delingha 50MW Tower CSP Project (P18-30)Issues during Commissioning and Operation (P31-39)

Upcoming Events

See more+

CONTACT US

Tex:+86-21-6111 0177

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news