Liddell Power Station
<BACKNO.1-1-3
Novatec’s 9 MWth solar boiler acts as a fuel-saver by feeding steam into the existing coal fired power station and reducing the coal required to operate the facility. The replacement of coal by the solar boiler will cut greenhouse gas emissions by approximately 5,000 tonnes per annum.
Project Overview | |
Project Name: | Liddell Power Station |
Country: | Australia |
Location: | Liddell (New South Walles) |
Owner(s): | Macquarie Generation (100%) |
Technology: | Linear Fresnel reflector |
Turbine Capacity: | Net: 9.0 MW Gross: 9.0 MW |
Status: | Operational |
Start Year: | 2012 |
Background | |
Technology: | Linear Fresnel reflector |
Status: | Operational |
Country: | Australia |
City: | Liddell |
Region: | New South Walles |
Lat/Long Location: | 32°22′ 34.0″ South, 150°58′ 48.0″ East |
Electricity Generation: | 13,550 MWh/yr |
Generation Data Explanation: | thermal megawatts-hour |
Break Ground: | 2011/1/1 |
Start Production: | 2012/10/1 |
Project Type: | Commercial |
Incentives: | $9.25 million from the NSW Government Climate Change Fund Renewable Energy Development Program |
Participants | |
Developer(s): | Novatec Solar |
Owner(s) (%): | Macquarie Generation (100%) |
EPC Contractor: | Novatec Solar |
Operator(s): | Macquarie Generation |
Generation Offtaker(s): | Australian National Electricity Market |
Collector Manufacturer (Model) : | Novatec Solar (Nova-1) |
Mirror Manufacturer : | Novatec Solar |
Receiver Manufacturer : | Novatec Solar |
Solar Field | |
Solar-Field Aperture Area: | 18,490 m² |
# of Lines: | 4 |
Line Length: | 403 m |
Collector Description: | Fresnel |
Heat-Transfer Fluid Type: | Water/Steam |
Solar-Field Inlet Temp: | 140°C |
Solar-Field Outlet Temp: | 270°C |
Power Block | |
Turbine Capacity (Gross): | 9.0 MW |
Turbine Capacity (Net): | 9.0 MW |
Turbine Description: | The 9 MWth solar boiler feeds steam into the existing 2000 MW coal-fired power station |
Power Cycle Pressure: | 55.0 bar |
Cooling Method: | Dry cooling |
Cooling Method Description: | Air-cooled condensers |
Design-Point Conditions: | 270ºC, 55 bar, 9.3 MWth peak thermal output |
Thermal Storage | |
Storage Type: | None |
*Reference from NREL
More from CSP Focus
NextLatest News
See more+-
What we've known about Indian CSP tender in Q1 2024
It was reported that India will carry out a round of renewable energy bidding in the first quarter of 2024, which requires bidders to submit a program must contain more than 50% of the CSP capacity. This news got great attention in the past weeks on the possibility of CSP revival in India. But how about the challenges to hinder the development of Indias solar thermal power generation in the past y
-
CSP Project Tenders Last Week (Apr.15-21)
Procurement and Construction Bidding- Xinhua Hydropower Bozhou 100MW CSP ProjectOn April 17, Xinhua Botai (Bole) Power Investment Co., Ltd. issued a bidding announcement for Xinhua Hydropower Bozhou 100MW CSP+900MW PV Project bid section VII: 100 MW CSP project PC general contracting. Bidding document acquisition time: from April 17, 2023 to April 24, 2023 at 16:00.One step closer towards Australi
-
One step closer towards Australia’s first commercial scale concentrated solar power plant
On behalf of the Australian Government, the Australian Renewable Energy Agency (ARENA) has announced it has approved $65 million in funding to Vast Solar to construct VS1, a first-of-a-kind 30 MW / 288 MWh concentrated solar power (CSP) plant in Port Augusta, South Australia.ARENA’s funding for VS1 is conditional upon the project reaching financial close, which is targeted to occur in late 2023.
-
CSP Project Tenders Last Week (Apr.8-14)
EPC Tender- SPIC Shanshan 100MW CSP ProjectOn April 8, SPIC Henan Company issued a public bidding announcement for the EPC general contract of SPIC Shanshan 100MW CSP Project. Application deadline: April 14, 2023, 23:59.Olympic Brewery: Paving the way for beer production by harnessing solar energy, in partnership with AbsoliconAthens, March 4, 2023 - In the framework of its ESG strategy with the k
Reports(Member Only)
See more+-
CSP Focus Membership Proposals
We are now proposing CSP Focus Membership, hoping to better serve our members to keep pace with the latest updates of ongoing CSP projects worldwide, and to establish and maintain business relations with major shareholders of the projects. CSP Focus offers to Membership exclusive access to:1. Daily/Weekly update and analysis on CSP policies, projects, technologies, market trend and corporate relea
-
The Latest CSP Focus Monthly Update
Join CSP Focus Membership to Get the Latest CSP Focus Monthly Update December Edition.
-
CSP Project Monthly Update 2022 December Edition
CSP Focus is presenting CSP Project (China) Update 2022 December Edition.Detail report is available for CSP Focus Membership.
-
Presentations-CSP Focus China 2021
The Report is for CSP Focus Members only.
Upcoming Events
See more+-
12th CSP Focus China 2022
2022.04.21-22 Beijing
-
11th CSP Focus China 2021
2021.10.28-29 Beijing
-
10th CSP Focus China 2020
2020.10.22-23 Beijing, China