中文  |  ENGLISH

Project Database

Yumen Xinneng 50MW molten salt tower CSP plant

Luneng Haixi 50MW Molten Salt Tower CSP Project

Kuwait Shagaya 50MW Parabolic Trough CSP Project

Dubai 950MW NOOR Energy 1 CSP+PV Project

150MW NOORo III Parabolic Trough CSP Project

200MW NOORo II Parabolic Trough CSP Project

160MW NOORo I Parabolic Trough CSP Project

CSNP Royal Tech Urat 100MW Parabolic Trough CSP Project

Power China Gonghe 50MW Molten Salt Tower CSP Project

Supcon Delingha 50MW Molten Salt Tower CSP Project

CGN Delingha 50MW Thermal Oil Parabolic Trough project

Shouhang Dunhuang 100MW Molten Salt Tower CSP Project

Kogan Creek Solar Boost

Lake Cargelligo

Liddell Power Station

Jemalong Solar Thermal Station

Sundrop CSP Project

Supcon Solar Project

Dahan Power Plant

Huanghe Qinghai Delingha 135 MW DSG Tower CSP Project

Golmud

Hami 50 MW CSP Project

Golden Tower 100MW Molten Salt project

Yumen 100MW Molten Salt Tower CSP project

Shangyi 50MW DSG Tower CSP project

Yumen 50MW Thermal Oil Trough CSP project

Gansu Akesai 50MW Molten Salt Trough project

Rayspower Yumen 50MW Thermal Oil Trough project

Gulang 100MW Thermal Oil Parabolic Trough project

Chabei 64MW Molten Salt Parabolic Trough project

Dacheng Dunhuang 50MW Molten Salt Fresnel project

Zhangbei 50MW CSG Fresnel CSP project

Zhangjiakou 50MW CSG Fresnel project

Urat 50MW Fresnel CSP project

Godawari Solar Project

Abhijeet Solar Project

Diwakar

KVK Energy Solar Project

ACME Solar Tower

Gujarat Solar One

Megha Solar Plant

Dhursar

National Solar Thermal Power Facility

Dadri ISCC Plant

Thai Solar Energy 1

Alba Nova 1

Augustin Fresnel 1

Llo Solar Thermal Project

Jülich Solar Tower

Archimede

ASE Demo Plant

Rende-CSP Plant

Andasol-1

Andasol-2

La Risca

Palma del Río II

Manchasol-1

Manchasol-2

Majadas I

Extresol-1

Extresol-2

Arcosol 50

Termesol 50

Extresol-3

Palma del Río I

Lebrija 1

Ibersol Ciudad Real (Puertollano)

Solnova 1

Solnova 3

Solnova 4

La Dehesa

La Florida

Planta Solar 10

Planta Solar 20

Gemasolar Thermosolar Plant

Puerto Errado 1 Thermosolar Power Plant

Helios I

Helios II

Andasol-3

Puerto Errado 2 Thermosolar Power Plant

Helioenergy 1

Helioenergy 2

Aste 1A

Aste 1B

Solacor 1

Solacor 2

Morón

Astexol II

Solaben 1

Solaben 2

Solaben 3

Solaben 6

Enerstar

Guzmán

La Africana

Orellana

Termosol 1

Termosol 2

Casablanca

Arenales

Borges Termosolar

Pedro de Valdivia

Atacama-1

Copiapó

Agua Prieta II

ISCC Hassi R'mel

ISCC Kuraymat

Ashalim

Ashalim Plot B

ISCC Ain Beni Mathar

eCare Solar Thermal Project

Airlight Energy Ait-Baha Pilot Plant

IRESEN 1 MWe CSP-ORC pilot project

ISCC Duba 1

Waad Al Shamal ISCC Plant

Greenway CSP Mersin Tower Plant

Shams 1

Nevada Solar One

Solana Generating Station

Saguaro Power Plant

Solar Electric Generating Station I

Solar Electric Generating Station II

Solar Electric Generating Station III

Solar Electric Generating Station IV

Solar Electric Generating Station V

Solar Electric Generating Station VI

Solar Electric Generating Station VII

Solar Electric Generating Station VIII

Solar Electric Generating Station IX

Kimberlina Solar Thermal Power Plant

Martin Next Generation Solar Energy Center

Genesis Solar Energy Project

Mojave Solar Project

Maricopa Solar Project

Crescent Dunes Solar Energy Project

Ivanpah Solar Electric Generating System

Sierra SunTower

Holaniku at Keahole Point

Colorado Integrated Solar Project

Tooele Army Depot

Stillwater GeoSolar Hybrid Plant

City of Medicine Hat ISCC Project

Khi Solar One

KaXu Solar One

Bokpoort

Xina Solar One

Redstone Solar Thermal Power Plant

Kathu Solar Park

Ilanga I

Latest News

See more+
  • Fire halts construction at Chile’s first Concentrated Solar Power tower

    A fire broke out Tuesday at the 110 MW Cerro Dominador CSP project, currently under construction in Chile’s Atacama desert, the developer said on Twitter.The fire was spotted at 20:00 local time Tuesday at the top of the 250-meter receiver tower, development company Cerro Dominador, a subsidiary of EIG Global Energy Partners, said.By Wednesday, local firefighters had brought the fire under contro

  • Vast Solar in talks with Australian mining groups for first Concentrated Solar Power plant

    Modular Concentrated Solar Power developer Vast Solar sees Australia’s mining sector as the greatest deployment opportunity before wind and PV growth creates wholesale market openings, Craig Wood, CEO ofVast Solar, told New Energy Update.Concentrated Solar Power with storage can meet mining operators’ demand needs.Vast Solar’s quest to build Australia’s first large-scale CSP plant could soon b

  • NREL Awarded $2.8 Million to Develop a Long-Duration Thermal Energy Storage Technology

    ARPA-E has challenged researchers to innovate a storage technology that can be deployed in almost any location and charge and discharge electricity, at a low fixed cost per cycle, for up to 4 days. 

The DAYS(Duration Addition to electricitY Storage) challenge is to supply an unmet market need – to provide grid-scale energy storage at a cost comparable to pumped hydro (currently supplying 95 perc

  • Noor Ouarzazate energy complex among top ten most influential renewable energy projects, according to PMI

    ACCIONA took part in the design and construction of the Noor I CSP plant (160 MW) that is part of this complex in the province of Ouarzazate, Morocco The Noor Ouarzazate energy complex, which includes the Noor I CSP plant that was designed and constructed byACCIONA together with its partners Sener and TSK, has been recognised as one of the 10 most influential renewable energy projects, according

Free Reports

See more+
  • Construction and Operation of SUPCON SOLAR Delingha 50MW Tower CSP Project

    40 pages in totalCompany Profile (P3-4)Construction of Delingha 50MW Tower CSP Project (P6-17)Operation of Delingha 50MW Tower CSP Project (P18-30)Issues during Commissioning and Operation (P31-39)

  • BrightSource Engineering and Manufacturing System

    Engineering, Supply Chain, Construction, Business Intelligence. What about the Min O&M?

  • Yumen Xinneng 50MW Molten Salt Tower CSP Project

    The project broke ground in June 2017, and 3 of the 15 modules are expected to be connected to the gird by the end of September, 2019. It will be the first large‐scale commercial CSP plant in the world taking innovative beam-down molten salt tower CSP technology.

  • Luneng Haixi 50MW Molten Salt Tower CSP Project

    With total capacity of700MW, Luneng Haixi Geermu Multi-energy Complement Integration OptimizationPilot Project consists of 200MW PV, 400MW Wind, 50MW CSP and 50MW energystorage system. Updating--Jan., 2019 Edition1. Overview (P2)2. Highlights (P2)3. Fast sheet (P3)4. Project Milestones (P4)5. Project Participants 5.1. Developer (P5) 5.2. Owner&Investor (P5) 5.3. EPC Contractor (P5)

Upcoming Events

See more+

CONTACT US

Tex:+86-21-6111 0177

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news