中文  |  ENGLISH

Home > Market > MENA > Here

Kuwait Oil Company looks to concentrated solar power to power crude extraction

2016.05.28     From: thenational

Kuwait is exploring renewable energy-enhanced oil recovery techniques, mainly from concentrated solar power, to slash import bills.


Kuwait Oil Company (KOC) said it was in discussions with companies to use concentrated solar power to extract oil as the Opec member country looks for alternative methods to maximise production at a cheaper price.


As the days of easy oil are over with about 70 per cent of the world’s remaining reserves classified as heavy, countries most commonly inject gas to improve recovery rates – known as enhanced oil recovery (EOR). Gas-constrained Kuwait is exploring renewable energy-EOR techniques, mainly from concentrated solar power (CSP), to slash import bills.


Raed Sherif, a senior consultant at KOC, highlighted that every company in the country was looking at what they can do to help meet the 15 per cent renewable energy target set out by the government. “Everyone is tasked to find applications and KOC is looking to meet our own 15 per cent from solar to reduce the energy imported,” he said last week at Menasol in Dubai. “We’re looking at solar as there’s a need for it in our EOR.”


The country has planned EOR projects in the north and west, which could be some of the largest projects in the world, according to the California-headquartered Glasspoint Solar.


Currently, one of the world’s largest projects is in nearby Qatar spanning 6,000 square kilometres. The North field, also known as the North Dome, holds an estimated 900 trillion cubic feet of recoverable gas reserves, or about 13 per cent of the world’s total proven gas reserves.


But, unlike Qatar, Kuwait faces a gas deficit triggered by its power sector as well as industrial expansion which will force the country to burn a high amount of imported natural gas or petroleum to generate steam.


The country began importing liquefied natural gas more than six years ago and Glasspoint estimates that using LNG to fuel these EOR projects could cost up to US$13 per million British thermal unit. “Solar steam could supply the majority of Kuwait’s thermal EOR needs at half the cost of these fuel alternatives,” Glasspoint said.


 

Despite last week’s slight rebound in oil prices to $50 per barrel, the two-year slump from highs of more than $110 have put a dampener on spending across the oil-rich Arabian Gulf. The hydrocarbon sector makes up nearly 60 per cent of Kuwait’s GDP and accounts for up 95 per cent of export revenues, according to Opec.


Mr Sherif said that timing and budgets have yet to be decided, but that renewable energy techniques in the country were going to happen in stages. “Things have a tendency to move slowly when there’s no urgent push, but we have to keep an eye on solar,” he said, adding that ultimately it would depend on the price tag.


“Kuwait is an emerging market and serious about solar power,” Mr Sherif said.


Leave your thoughts here

Free Reports

See more+
  • Dubai 950MW NOOR Energy 1 CSP+PV Project

    The $4.4 billion Noor Energy 1 solar thermal project will be the world’s largest CSP plant and includes a 100 MW CSP tower plant, three 200 MW parabolic trough CSP systems, 250 MW of PV capacity and 15 hours of molten salt CSP storage capacity.

  • China Large-scale CSP Projects Update

    Updating--Jan., 2020 Edition24 pagesPart 1: Background and Fact Sheet (P1-11) · Implementation and adjustment of 1st batch of CSP demonstrations· FiT policy update and prediction· Sum-up on the 20 projects technology, location, ownership and key participants Part 2: Milestones of Ch

  • Suppliers List of China Key CSP Projects (Updating)

    13 key concentrated solar power projects in China undergoing:Shouhang Dunhuang 100MW Molten Salt Parabolic Trough ProjectRoyal Tech Yumen 50MW Parabolic Trough ProjectDCTC Dunhuang 50MW MS CLFR ProjectRayspower Yumen 50MW Trough ProjectCNNC Royal Tech Urad 100MW Parabolic Trough ProjectSupcon Delingha 50MW Molten Salt Tower ProjectLuNeng Haixi 50 MW Solar Thermal Tower Plant ProjectPower C

  • Construction and Operation of SUPCON SOLAR Delingha 50MW Tower CSP Project

    40 pages in totalCompany Profile (P3-4)Construction of Delingha 50MW Tower CSP Project (P6-17)Operation of Delingha 50MW Tower CSP Project (P18-30)Issues during Commissioning and Operation (P31-39)

Upcoming Events

See more+

Project Updates

See more+

CONTACT US

Tex:+86-21-6111 0177

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news